Products
Home > Products > PTFE Products > Others Products > TEFLON SHOE STB-250
Unit Price: | USD 1.6 / Bag/Bags |
---|---|
Payment Type: | L/C,T/T,D/P,Paypal,Money Gram,Western Union,RMB |
Incoterm: | FOB,CFR,CIF,FCA,CPT,CIP,EXW |
Min. Order: | 2000 Bag/Bags |
Delivery Time: | 10 Days |
Basic Info
Model No.: STB-250
Material: PTFE
Kind: Engineering Plastic Sheet
Water Absorption: <0.01%
Contraction Percentage: <0.4%
Tensile Strength: (81~130)MPa
Prouct Material: Teflon,Aluminum
Model: STB-250
Additional Info
Packaging: CARTON BOX
Productivity: 2-3TONS PER MONTH
Brand: CHUNHUAN
Transportation: Ocean,Land,Air
Place of Origin: CHINA
Supply Ability: 40TONS PER YEAR
Certificate: ISO9001,FDA,MSDS
HS Code: 3920991000
Port: SHANGHAI,NINGBO,QINGDAO
Product Description
Teflon shoe,Iron ---0.3mm,0.6mm,0.8mm,1.0mm
Our Ironing shoes achieve the highest quality possible, as Teflon is heat bonded to a chemically treated aluminum that eliminates the Teflon delaminating from the shoe base.
Additionally, the frames are both crimped and riveted onto the aluminum/heavy-duty Teflon base. A Nomex felt liner is then applied to the inside nose area extending toward the rear on each side of the shoe to stop steam kick back and to insure a proper fit.
An Iron show cover diffuser helps to provide an even,soft flow of steam by spreading steam output accoss the entire shoe. Diffusers help prevent scorching and shine that can be caused by ironing centain fabrics,such as wool,taffeta and many synthetics.They also offer additional protection for fabric that are prone to snags or that are easily damaged by heat.Diffusers are simple to use,just trim the diffuser to fit the shoe. Start ironing smoothly with great products from Newhouse Speciality!
Our Service
1)Your inquiry will be replied within 2 hours during working time,Within 24hours when rest time.
2)Our working time is 7.30 AM --17:30 PM,Monday to Saturday.
3)General samples time can be arranged within 2--5days.
4)Orders will be produced exactly as request and approved samples.
5)When mass production,we send photos to show the production line.And confirm the estimate time again.
6)At the end of mass production,photos and samples will send to you for approval.You can arrange the inspection.
7)Before shipment,our QC will have inspection to make sure the quality.
8)We always try best to ensure every order to delivery in time.
Payment Terms
1)T/T,Cash,L/C.
2)30% deposit,70% balance before shipment.
3)Lead time: 15 days after received deposited for 2tons.
4)Delivery way: By sea,By air, By EMS,DHL,UPS,TNT,FedEx.
Packing & Delivery
For sample: By EMS,DHL,UPS,TNT,FedEx
around 5--7 working days to arrive
For Bulk order:
1.Qty of 2tons,within 15 days.
2.Via Sea
3.Delivery time:we will finish production in 15days for 2tons.
4.For 20 GP,may nee around 30days.
Product Categories : PTFE Products > Others Products
Hot Products
Send Inquiry
Ms. Alice wang
Email:
Send Inquiry Tel:86-511-88516510
Fax:86-511-88515840
Mobile Phone:+8618005286016
Email:
Address:YONGSHENG INDUSTRIAL ZONE, Zhenjiang, Jiangsu